Changes and corrections

Every change to Citiwise and to how it reads UDCPR, dated, with its clause where a rule is concerned.

02.11.2026 · 1.40

Refuge areas are sized again by the people on the two floors each one serves, 0.3 m² a person and never less than the table's area. That is how the scrutiny itself sizes them: for most tall buildings it asks about 600 m², not the 15 m² a refuge that 1.39 took from the table alone.

02.11.2026 · 1.39

The rest of the rules now come from the tables the planning authorities scrutinise with, as those tables give them. FSI, premium and TDR are read for each authority's group, so Regional Plan areas now carry TDR and Gunthewari plots take their own rows. PMRDA reads its own FSI and margin tables. Coastal plots in Ratnagiri and Murud-Janjira take their council's CRZ-II row. The Nagpur corridor takes its own margins. The road a tall building needs follows the access road table, 15 m above 50 m and 18 m above 70 m, and refuge areas follow the refuge table. Parking takes the CIDCO factor, the bay sizes and the row-house exemption as their tables have them, and water and toilets follow Tables 12-A and 12-C. Where a table says less than UDCPR's text, the study keeps the table's figure. The text is read only where no table holds the rule.

02.11.2026 · 1.38

Every margin now comes from the rules tables the planning authorities scrutinise with, as those tables give it. Table 6-E is read from its own table for each kind of building, with its least road; the margins of Table 6-H come from the industrial table; the congested side margins of Table 6-C step at 250 and 500 m², as that table has them; and row houses keep the 1.5 m side margin the table gives at the end of a row. Where UDCPR's text says more than the table, the study keeps the table's figure and says what the text adds, for the authority to confirm. The tables on the page are drawn from the same rows, so what you read there is what the study used.

02.11.2026 · 1.37

The floors you choose now stay chosen. The questions asked for the floors before the ground floor, and answering stilt parking or a floor height afterwards quietly went back to the building that fits, so a Stilt + 6 could come out as Stilt + 3. The ground floor and the basements are now asked first, a later change to either keeps your floors, and the floor plate shrinks to what the built-up area needs on them. Where the floors chosen are above the permissible height, the building is held at the most the height allows and the result says so.

02.11.2026 · 1.36

When you choose the number of floors, the building is now drawn at the size those floors need, not at the whole area the margins leave. A plot that carries 2,170 m² at Stilt + 6 shows a floor of about 362 m², drawn centred within the margins, which are shown dashed around it, and the study says how large a floor the margins would allow. The building that fits, when you leave the floors to Citiwise, is unchanged.

19.10.2026 · 1.35

The site and the connector now say plainly where UDCPR 2020 applies: across Maharashtra except Greater Mumbai and the areas 1.1(i) leaves out, MIDC, NAINA, JNPT, the hill-station councils, Chikhaldara, notified eco-sensitive regions and Lonavala. The UDCPR library gains the regulations and tables it was missing, among them 5.3.1, 10.2.3 and Tables 3A to 3D, so every clause a study cites opens on its own page, and every heading now reads whole. The glossary's basic FSI, ancillary area, height and fire lift entries now say exactly what the text says. A study cites only the clauses its figures rest on.

The study works better on a phone: the toolbar fits at any width, with the less used links behind More, and the section drawing labels basements without overlap. In the questions, focus is always visible, Back in the browser goes back one question, and a reload keeps your answers. A study that cannot be prepared says why, whether the connection, a fact the rules refuse or the link itself, and offers to try again or to go back to your answers. The study opens faster, with no request for clause text until it is shown.

19.10.2026 · 1.34

The whole product was reviewed line by line, and every figure the review found wrong has been put right. An IT building in the R-1 zone is allowed only on a road of 9 m or more, as 4.3(xix) says, and shops, offices, hotels and mangal karyalayas outside it need the road the R-2 zone needs (Table 6-E, 7(b) and 5(a)). The premium for IT additional FSI follows 7.8: 10% in the corporations of the Mumbai and Pune regions, 15% elsewhere, 5% in Regional Plan areas, and none in Vidarbha, Marathwada, Dhule, Nandurbar, Ratnagiri and Sindhudurg. At an inward corner where two margins differ, the building now keeps both margins; before, it could reach the corner. Shops and row houses on plots up to 100 m² need no parking (Table 8-B note iii). The page and the study now agree on layout plots, parking for shops and offices, farm houses and buildings just at 15 m.

Measuring a plot is safer. A plot given in feet as corners is read in feet. Where sides and diagonals fit more than one plot, the study takes the one with every diagonal inside it and says which corner could lie the other way, or asks for that corner's angle. The area statement always adds up to the plot. A boundary that crosses itself, a side of no length and figures no plot can have are refused in a sentence.

The appraisal prices only the carpet the building can hold and the rights it uses, shows other costs as a row, and shows a loss as a loss. Without a TDR rate it prices the building without TDR as the engine draws it. The offer page appears whenever a sale rate is given and says what is still needed, and the profit you need is asked with the sale rate. A study of a plot in a specified area, such as Table 10-B in Kolhapur or Koregaon Park, opens again on the first visit. The questions read Marathi names of the corporations and district towns, accept only plain numbers, and mark a plot not yet given as still needed. The site and the connector refuse inputs that could hang or crash them.

18.10.2026 · 1.33

Every study now shows the regular building: the largest rectangle that fits wholly within the margins, at any angle, and the largest square to the road. On an odd plot the envelope is not a floor anyone would build, so the study says how large that rectangle is, what share of the floor plate it keeps, and how many floors it takes to carry the same built-up area. It is drawn dashed on the plan, in the study's envelope plan and in its key, and is the same in the browser and on the server.

18.10.2026 · 1.32

Measuring a plot is harder to get wrong. When the figures do not fit one plot, the sheet now names the one figure that, left out, lets the others agree, and says how it was likely misread: two digits swapped, feet typed as metres, a tape read a metre or ten centimetres off, the angle outside the plot, or degrees and minutes read as a decimal. One tap uses the corrected figure. Bearings and lengths can be pasted from a survey and are refused, with the gap, when they do not close. Angles can be typed in degrees, minutes and seconds, here and through the connector. The area is flagged when it differs from the 7/12 by more than 3%, and hectares and ares are read. On a phone the corner handles are larger, and any side can take a new corner at its middle.

18.10.2026 · 1.31

The opening of a study plays at the pace of reading again, about forty-six seconds, every time it plays: each finding is held long enough to read, with the regulation it rests on beside it, the plot drawn side by side and the building rising floor by floor. It plays once a session, and one tap skips it.

18.10.2026 · 1.30

The study now opens with the work shown in full. For about fifteen seconds the plot is drawn side by side, each side lights as its margin is read, and the building rises floor by floor on its footprint while every regulation it rests on streams beside it. It plays for everyone who opens a study, including a landowner opening a shared link, once in a session, and one tap skips it.

The review at the end of the questions now offers the drawing tool, with every answer carried into it. Environmental clearance is shown as required from 20,000 m² of built-up area, the threshold of the Environment Impact Assessment Notification, 2006, to which 3.1.5 defers, instead of being left to confirm on every plot. Areas the regulations state, such as 27.87 m² of carpet, keep their decimals in the study. On a narrow plot the area label no longer sits on the side markers.

16.10.2026 · 1.29

A review of the whole product. The one-page study no longer breaks its opening sentence at a decimal point. The executive summary fits on one sheet, since the cover already carries its three figures. A study with shops in its unit mix counts units, not flats, and shows a pro rata ancillary rate to two decimals so the arithmetic adds up. Square feet are rounded the same way throughout. The section labels every level again. The permissible uses table says plainly that its areas are what fits under each use.

Clause 6.2.6 is cited only where a plot abuts two or more streets. A building below 15 m no longer lists a fire NOC to confirm. A bungalow now carries its water and sanitation as one home. The guided questions no longer speak of a use before one is chosen, and say when a figure assumes the plot is outside the gaothan. A study opened from a shared link or an app opens straight on the study, and the report fits a phone screen.

16.10.2026 · 1.28

A side of the plot can now be a common wall. A semi-detached house keeps a side margin on one side only, as Table 6-D note 4 provides, and row houses keep none between them, so the side they share takes no margin and the floor plate grows to match. The common wall is offered for a bungalow and for row houses only, and a semi-detached house may share one side.

A bungalow on a plot above 300 m² now carries its parking. Table 8-B note ii waives parking for a bungalow only up to 300 m²; above it the house is one tenement of Table 8-B, banded by its carpet area, with 5% for visitors. Earlier the study gave no figure above 300 m², and the tool gave one from an older reading.

A plot in a Regional Plan area now lists the building line of the Ribbon Development Rules among the checks by location, for plots on a National Highway, State Highway or Major District Road, where that line is more than the margins of these regulations (6.2.2 note i).

16.10.2026 · 1.27

A plot regularised under the Gunthewari Act now takes TDR at 50% in the study itself, as 6-G note xi requires of every such plot. Earlier the study showed the full TDR and gave the reduced figure only beside it.

A building of homes with shops or offices now takes its ancillary area pro rata, 60% on the homes and 80% on the shops and offices, as 6.1.1 note 4 provides for a building of mixed users. This applies when the unit mix gives the count of every type. Otherwise the study keeps 60% and says so.

The green building FSI of 7.10 is now shown on its own in the area statement, apart from the ancillary area, and every way to build the plot includes it.

16.10.2026 · 1.26

Five facts that change the figures can now be given. Step margins under 6.2.3(c) let each floor keep the side and rear margins its own height needs, so the lower floors are larger. A green building rating adds the incentive FSI of 7.10 on the basic FSI. Land steeper than 1 in 5 is left out of the plot for FSI. A sanctioned layout's allotted basic FSI replaces the plot's own under 3.9(iii). Premium FSI can be left out of the study.

The marginal distances were read again against Chapter 6. An assembly building on two roads takes 12 m on its one major road only (Table 6-E). A public building takes the side margins of Table 6-E, which are 6 m above 24 m and not 12 m. Industrial plots take the rows of Table 6-H at their exact boundaries, with the least road width each row requires. A congested plot no wider than 7 m takes no side margins (Table 6-C note 2). A fuel station takes 4.5 m in front and at the sides. Each margin now cites the clause it comes from.

15.10.2026 · 1.25

Flats with shops in their unit mix are now read as a building of mixed occupancy, as shops below flats always were. Under 1.3(93)(xiv)(iii) such a building is special once a floor reaches 500 m², and the study now says so, offers to keep it out of the special building rules, and offers the sprinklered way of the note to that clause. Offices in the mix do not change it, since business buildings are not among the occupancies the clause names.

The study and the tool now say how Citiwise stands behind its figures. Each release is tested against the UDCPR text and real scrutiny reports, with the results published on the Checks page, and any figure that looks wrong can be sent to us, with every correction recorded here.

15.10.2026 · 1.24

Every study now comes with a one-page summary for a first meeting or a landowner: the plot drawn within its margins, the permissible built-up area with how it is made up, the building, the special building question, parking, lifts and approvals, and the three facts to confirm. It leaves out every rate and price, so it can go to anyone. The full study links to it, and it links back.

A second reading of the studies against the text corrected these. A school or college keeps its playground of 3.4.1(vii) off the floor plate from 0.4 ha, as the open space it replaces; below that it is for the Authority to ask. A school's parking is set by its administrative area and class rooms, as Table 8-B counts it, and offices, shops and other buildings park on an estimated carpet area rather than the whole built-up. The higher FSI of Table 7-A is shown as replaceable by TDR. A building with no floor above the ground needs no staircase or fire lift, and its fire tower is left to the Chief Fire Officer. The schemes on a fuel station plot are worked at the zone's own FSI. A residential building of 15 m or more now asks for the Fire Officer's view, and a business building with large floors notes that Table 6-E groups it with special buildings. Industrial land can be converted to residential and commercial uses, schools and halls among them, under 4.8.1. Fire tank figures are described for what they are, a schedule under the Fire Act and the National Building Code. The minimum plot of Table 6-D is shown only for the buildings it governs. For group housing, inclusive housing is also given as tenements of 20% of the basic FSI. The barrier-free access of 13.1 is back in the requirements.

15.10.2026 · 1.23

The study now shows how each figure is reached, beside the figure. The development potential is set out part by part, each with its working: the net plot times basic FSI, the plot times premium FSI and TDR, the in-situ FSI for land handed over, and the ancillary area on their sum. Parking is worked the same way, each unit type at its Table 8-B rate, then visitors, the town's factor and the rounding of the whole building. The review in the tool opens with the same working, so the answer can be checked before the study is prepared.

The study tells one story about the building. Where the indicative building carries a little less than the full area, the summary says how much it carries, and what the remaining area would need. The height options give each one's share of the permissible area and name the margins front and sides. Two tables that compared the building with and without TDR are now one.

A good deal has been taken out. The general rules for rooms, light, exits and fittings, which are the same on every plot, now point to Chapter 9 instead of filling pages. Schemes and approvals that do not apply are named in one line, and the location checks sit together. Empty rows of Proforma I are gone, and the envelope plan dimensions each side of the footprint once. A fuel station no longer shows an ancillary area it does not get.

15.10.2026 · 1.22

Premium FSI can now be left, as TDR could already be. The study asks how much of the plot's potential to take, premium FSI and TDR each taken or not, and is drawn on the answer. Without premium FSI, no premium is paid on it, and a hospital, school or hotel leaves its Table 7-A higher FSI with it.

A plot can be drawn from a sketch, a measurement sheet or a photo of either in ChatGPT, Claude and any app that reads Citiwise. The figures go in as written, feet and inches included, with the 7/12 area in guntha, acres or H.R. Sides, angles and diagonals may come in any mix, and a side not measured may be left out where the rest fix it. When more figures are given than the shape needs, all of them are fitted together, each with how far it sits from the plot. A figure that no tape could be that far off is named, and the drawing is refused.

The study has been read page by page against every clause it cites. Proforma I now splits the Table 7-A higher FSI from the premium FSI below it, so neither is counted twice. In the industrial zone, hospitals are permitted under 4.8(iv)(l), and a fuel station is held to its Table 6-E FSI of 0.25. The study now covers the special safety regulations of 13.6(A) for large hospitals, schools, assembly buildings and malls, and the bus bay of 8.1.1(vi) for more than 500 flats. A special building's second staircase gives way to its fire tower (13.6(B)), and its lift reads as the fire tower lift where no other lift is needed. Parking for a hospital is given by the number of beds, in-situ FSI names the land it came from, and an owner's house in the gaothan belt is shown with no premium, as the third proviso to 5.1.1 says. Lists of clauses that fill a page now run on to the next one, and a long site name no longer pushes the cover over.

15.10.2026 · 1.21

A building can now be kept out of the special building rules of UDCPR 1.3(93)(xiv). Where a plot's full potential would make it special, the study asks which way to go, with the figures for each answer. Kept out, the building stays at 24 m or below, and for shops, schools, hospitals and the other uses the floor area reaches, each floor stays below 500 m². For flats with shops below, a third answer is offered: sprinklered throughout with the travel distances kept, floors may go up to 750 m² below 24 m and the building still stays out, subject to fire NOC.

The study sets the buildings side by side: the built-up each carries, the floors and height, each floor, the least margin, and what the special building brings with its clauses. That means 6 m margins on every side, fire clearance, a fire tower with its evacuation lift, refuge areas above 24 m and a structural stability certificate. Flats alone are never special by floor area, only by height, so a large floor of homes is never held back. Where each floor is held below the floor area, the study now draws the floor at that area, as the tool does.

15.10.2026 · 1.20

The plot is now drawn from its measurements, the way a site plan is made. Beside the plan is a measurement sheet. Each side goes in as it was taped or read from the Land Records measurement sheet, corner to corner, with the corners lettered A, B, C. The diagonals measured across the plot, and angles where the sheet gives them, go in too, in metres or in feet and inches. Corners can also be pasted from a total station, a DGPS or a list of latitudes and longitudes, and north then comes from the grid.

Every figure is checked against the others. Where the figures fix the plot more than once, it is fitted to all of them, and each one shows how far it sits from the rest, so a misread tape shows up before the study is made. Where they do not yet fix it, the sheet names the corner still free and the one diagonal to measure on site that would fix it. Where they fix it with nothing to spare, it names the diagonal that would check it. For a rectangle, that is the length the diagonal should read if the corners are square.

The area is worked out by the triangulation method of UDCPR 2.2.3(iii). The plot is divided into lettered triangles, every length is taken to the centimetre as printed, and each triangle's area is worked by Heron's formula from those same lengths. The plan is then rebuilt from them, so the drawing, its dimensions and its area are one set of figures, and the table can be checked with a calculator.

The three areas of Appendix A, item 1, now stand side by side: the 7/12 or property card, the measurement sheet and the site. The 7/12 area can be given as the 7/12 writes it, in hectare, are and square metre. The least of the three is the plot area. A plot drawn from its measurements keeps its measured dimensions on every sheet, and only its area for FSI is the smaller figure. The study gains an Area statement sheet with the area diagram, the triangles and items 1(a), (b) and (c) of Proforma I filled in. In ChatGPT, Claude and other apps, draw_plot returns the same statement.

15.10.2026 · 1.19

A study prepared with your rates now has a landowner’s copy. It is the same study without the sale rate, construction cost, margin, asking price or offer. Its link, its PDF and its short link carry none of them, so nothing on the page can bring them back. The copy opens from the study’s top bar and from the documents in the tool.

In your own copy, the money now stays on two sheets, the offer and the appraisal. The cover, the executive summary, the development potential and the opening screen carry the rules, the areas and the building only, so those sheets can be shown across a table. The figure for the land is now called what the land carries throughout.

15.10.2026 · 1.18

You can now choose whether TDR will be bought. With TDR left out, the building is drawn on basic and premium FSI with their ancillary area, and every figure follows from it, from the floors and margins to the parking and the appraisal. Either way, the study sets the two buildings side by side. It shows the built-up, the floors and height, the flats, and the lifts and fire lift the taller one needs. Given a sale rate and construction cost, it shows what the extra building earns before the TDR is paid for, and so the highest price a square foot of TDR is worth to the plot. With a TDR rate too, it shows what buying adds. The ancillary area that comes with each square metre of TDR is counted, which is why TDR often pays at a higher rate than it seems to.

A specified area chosen for a Regional Plan area or a city of Chapter 10 now stays in the link and the report.

15.10.2026 · 1.17

Chapter 14's schemes are now set out for every plot, in the chapter's order. They are integrated townships, affordable housing, Pradhan Mantri Awas Yojana, heritage buildings, slum rehabilitation in both its forms, urban renewal of clusters, eco-tourism near sanctuaries, IT townships, logistic parks, aerospace townships and MIDC's integrated industrial areas. Each shows whether the plot meets its least area, road and zone, and the FSI or built-up it would allow. Given the eligible hutments and the land and construction rates, slum rehabilitation works out the rehabilitation area and the free sale it earns. Urban renewal gives its incentive in the same way.

A plot in a TOD zone now carries the rest of 14.2. That covers premium rates, tenement sizes, mixed use, parking at half, the Metro's NOC, the front kept for pedestrians and the uses not allowed. In Nagpur's Metro corridor it gives the side margin of Table 14-Q for the building's height and the parking of Table 14-R. Housing, commercial buildings and hospitals above the area 13.5 sets, and starred hotels, now show the duty to treat their wet waste on site.

Every one of the 686 regulations and tables of UDCPR is now accounted for, and a test keeps it so. Each is worked into the study, set out on the pages, or recorded with what it is: a definition, a procedure, a power of an authority, part of a scheme's own process, or a regulation that has ceased. Every table of the rules data is now read or checked against the text. The page on how Citiwise is checked gives the counts by kind.

15.10.2026 · 1.16

The areas of Chapter 10 with rules of their own can now be chosen for their city, as Kolhapur's and Koregaon Park already could. In Pune these are Parvati and Chatushrungi, and the land around ARDE and HEMRL. In Thane they are Ram Maruti Road and Gokhale Road, the Eastern Express Highway, the green belt and low density zone around the chemical industries, the Air Force station, the height zones around the defence establishment at Kolshet, and the G-1 and G-3 zones. Nashik has the final plots of TP Scheme No. 1 and the 36 m road from Gangapur to Ambad. Vasai-Virar has its low density zone. Mira-Bhayandar has the strip along its 45 m and 30 m roads and the Manori-Gorai-Uttan area. NMRDA has the ring road belt, residential townships in the agricultural zone and the belts around its gaothans. The eco-sensitive zones around Sanjay Gandhi National Park and Tungareshwar are included too. Each takes the heights, setbacks, FSI, premium and uses its regulation gives.

In Navi Mumbai and CIDCO's area, business and mercantile use now takes the basic FSI of 10.10.1 for its plot and road. The schemes now include those of the cities. These are Thane's redevelopment, its public parking near metro stations and its podium, CIDCO's reconstruction with Tables 10-C to 10-F, its land compensation scheme and temporary development, Panvel's TDR on premium, Ulhasnagar's regularisation, Bhiwandi's affordable housing, TDR for encumbered land in Nagpur and the NIT improvement schemes. Pune's and Nagpur's regulations that ceased under 10.15 are marked as ceased and are not applied.

15.10.2026 · 1.15

The study now sets out the schemes of Chapter 7 for each plot, in the chapter's order. These are Government staff quarters, MHADA's new housing and the redevelopment of its schemes, redevelopment that keeps the FSI of the existing building, the redevelopment of co-operative societies' and tenanted buildings, biotechnology units and public toilets. Each shows what it would allow on the plot and the conditions it turns on. Given what stands on the plot, the study works out the figures. For a MHADA scheme these are the rehabilitation entitlement, the incentive and the shares of Tables 7-B to 7-E. For a society it is the incentive of 7.6.1 and the carpet area each home is raised to.

The building requirements now cover Chapter 9 part by part. They give the plinth, room heights of Table 9-A, kitchens, baths and water closets, lofts of Table 9-B, mezzanines, garages, cabins, openings and the ventilation shaft of Table 9-C for the building's height. They also give travel distance, exit capacity, staircases, doors, corridors, ramps, cupboards, roofs and the amenities 9.31 asks of a housing scheme for its number of flats. From Chapters 12 and 13 they add structural design, building services, sanitation and signs. A building used by the public on a plot above 2,000 m² gets the access for the differently abled of 13.1, and a large residential layout gets the space for grey water of 13.4.1.

15.10.2026 · 1.14

The study now sets out what the application carries and what the owner keeps to while building, from Chapter 2. It gives the scale of the site plan, building plan, layout plan and service plan, the sheet sizes of Table 2-A, the colours of Table 2-B, the signatures and the certificate of supervision. It says when a structural stability certificate is needed and when the display board is, and covers deviations, test records, inspection and the plans the Authority publishes. In a Regional Plan area it adds the appeal to the Board of Appeals.

From Chapter 3, a plot reached by an access way is checked against the widths and lengths of 3.2.2. A street narrower than 4.5 m in a congested area shows the boundary moving back under 3.3.5. A nallah in a Municipal Corporation shows the cycle track of 3.13.2. Land laid out into plots, or built as a group housing scheme, now gets the internal road width of Tables 3A to 3C for the length of its road, with cul-de-sacs, through roads, handing over, open spaces, relocation of a reservation and amalgamation. The rule table for internal roads is now applied, after being checked against the text. The site checks add landfill sites, lakes and dams, highway setbacks and the restrictions other departments notify.

The areas of Chapter 5 with rules of their own can now be studied in a Regional Plan area. These are Tarapur, land near railway stations, the padas of Ratnagiri, Sindhudurg's T-2 to T-5 tourism zones, the Mahabaleshwar-Panchgani buffer, the Satara conservation zone and land above 1000 m, Nagothane, the wadi lands and the Rajpuri and Usar growth centres in Raigad, Sector R near Lonavala, the Aurangabad tourism strips, hill stations and the LIGO site. Each takes the uses, FSI, premium, height, storeys, coverage and margins its regulation gives. The study also notes that earlier permissions stay valid under 5.1.3.

The TDR section now explains what a Development Right Certificate carries, how it is transferred, and that no infrastructure charges fall on it. A reservation on the plot now shows the other ways the land may go to the Authority, for TDR or for a Reservation Credit Certificate under 11.3.

15.10.2026 · 1.13

Every land use zone of Chapter 4 can now be studied. The loom industry cum residential zone allows power looms within the floor area, horsepower and workers 4.9 gives, and is otherwise read as residential. The regional park, tourism development, afforestation and green zone 2 take the uses and FSI of 4.14, 4.15, 4.16 and 4.18, each read from the agricultural uses of 4.11 as those regulations direct, with premium at the share of the land rate the text sets and no TDR. The public utility zone takes public utilities only, the special economic zone its own uses, and the airport zone the services incidental to an airport. Nothing is offered in the hill top and hill slope, forest, defence, mines and quarry or woodland corridor zones, and the study says which authority decides there.

In the agricultural zone a marriage hall now needs the least plot area of 4.11(xxvii), and a use 4.11 ties to a road width now needs that road. A marriage hall and agro godowns now reach FSI 1.00 with premium, and Government buildings are allowed at the basic FSI, as 4.11(xvii), (xxvii) and (xiii) say.

15.10.2026 · 1.12

Citiwise now covers every planning authority UDCPR applies to. The Nashik and Chhatrapati Sambhajinagar Metropolitan Region Development Authorities, the Nagpur Improvement Trust and the Maharashtra Airport Development Company's notified areas at MIHAN, Purandar and Shirdi are now listed. Each takes the FSI column, the height limit and the TOD regulations its kind of authority takes, and MADC's airport and public zones take the basic FSI of 1.50 that 10.12.1 gives them. Kaij, Natepute, Besa-Pipla, Bahadura, Malegaon Budruk and the Nagar Panchayats that share a name with a town in another district are added under their districts. The Jawaharlal Nehru Port Trust area is marked as outside UDCPR, as 1.1(i) says. A study in Dahanu notes the eco-fragile area around it. Towns can now be typed with spaces for hyphens, as in Mira Bhayandar.

Row houses now take the margins of Table 6-D, Sr. 6: 2.25 m in front, none between houses, 1.5 m at the rear. Before, they took the margins of a detached building. Koregaon Park in Pune is now worked out under the Collector's special building rules of 10.1.2. Those rules set 20 feet from roads 40 feet wide or more and 15 feet from others, 10 feet at the sides and 20 feet at the rear. A third of the plot may be built upon, in two storeys, with no TDR.

A plot can now be marked as in the coastal regulation zone or within a river's flood lines. CRZ-II and the area within the blue line take no TDR (11.2.8). Nothing is built in CRZ-I, in the No Development Zone of CRZ-III or within the blue line. Between the blue and red lines, the plinth stands 0.45 m above the red flood line (3.1.3). A village plot in a Regional Plan area that lies within the belt around the gaothan is now studied as residential land, with the premium of 5.1.1 on the whole land, and no premium for an owner's own house. Where a DP reservation lies on the plot and you say what it is for, the study now sets out how the owner may develop it himself under 11.1. It shows the land and the built amenity to hand over and the full potential kept on the rest.

Every table of the rules data is now accounted for. Each one is either read for the figures, checked against the text of UDCPR, replaced by UDCPR itself, waiting for the part of Citiwise it serves, or a list of names and settings. The page on how Citiwise is checked gives the counts.

15.10.2026 · 1.11

Kolhapur's specified areas are now worked out in full under 10.9.1 and Table 10-B. Rajarampuri, Shahupuri, Laxmipuri, Tarabai Park and the other areas of the table each take their own marginal distances, at the front, at the sides and at the rear opposite the road. Where a row is printed for a plot size, the row for the plot is chosen. Where the table limits the built-up area of a floor to a share of the plot, each floor is kept to it. The basic FSI of Note 1 applies: 1.50 for residential and 2.00 for residential-cum-commercial use in Sr. 1 to 3, 26, 27 and 31, and 1.10 in the rest, with premium FSI and TDR as Table 6-G allows (Note 3). The table governs up to 21 m in Sr. 1 to 3 and up to 15 m in the rest. In the rest, from 15 m to 21 m, the rear margin increases by 1 m for every 3 m and the side margin continues. Above that, the general margins apply. Rows that the table sends to the gaothan regulation take Tables 6-B and 6-C. Where a distance printed in feet and inches does not match the metres printed beside it, the larger is taken and the study lists it as an item to confirm. For a Rajarampuri plot of 294 m² on a 12 m road, with stilt parking and four floors above it, the floor within the margins is about 211 m², where the general margins left about 145 m². The building that fits carries 1,247 m², where it carried 621 m². Kolhapur's plots carry a question for this, and the API and the apps take it as specified_area.

Corrections. A farm house in the agricultural zone is now kept to a built-up area of 400 m² in any case, as ground and one upper floor at most 9 m high (4.11(ix)(b)). Before, only its FSI of 0.04 was applied, so a large holding showed more. Transit Oriented Development is no longer described as for Pune alone. 14.2.1 applies to PMRDA under 14.2.2, and to the other Municipal Corporations, metropolitan authorities and CIDCO under 14.2.4. The Nagpur Metro Rail Corridor takes Table 14-P, by plot area and road width together, with no TDR (14.2.3).

14.10.2026 · 1.10.4

On a phone, a study is now set for reading: each section in one column at a size that reads without pinching, with tables that scroll sideways where they are wide. The printed sheets are one tap away, and the PDF is always the sheets.

The opening of a study grows shorter as you grow familiar with it: in full the first time, briskly from the third study, and a moment from the tenth. The site's sections are now Towns, UDCPR, Glossary and Apps. How Citiwise is checked and this page of changes sit with Support at the foot of every page. Every study names the release of Citiwise that worked it out, as listed here.

14.10.2026 · 1.10.3

The sample study is now read the way a sample flat is walked through. Try it on a sample plot, from the first question, works out a sample plot of 1,000 m² in a Pune suburb at illustrative rates, its facts going in first. The study it opens is marked as the sample on every sheet, as document CW-FS-SAMPLE, so a copy that is shared or printed can never pass for a real study.

On screen, a short note stands beside each sheet that matters, saying what it is for: the offer as the sheet for a land meeting, the clauses beside every figure, the area statement in the permission's own form, the appraisal that your rates decide, the permission stage by stage, and the papers to read before relying on any of it. At the end, Start with your plot opens the questions for your own land. The printed sample and its PDF carry the study alone.

14.10.2026 · 1.10.2

The sample is now tried, not just seen. Try a sample plot, on the first question, opens with the sample's facts going in first: the plot, its sides and road, the flats, the stilt and the rates. The figures are then worked out from them, and the study ends as the sample study.

The study now begins from every fact it was given, not only the plot. A continued sheet at the front no longer shows a placeholder where its number would be. A sheet that overflows by a few lines is set closer before it is split, so the executive summary and the clauses cited each stay on one sheet. Where the Permission sheet sets out the stages, the procedure list keeps only what goes with the proposal besides them. The sample study is 20 sheets where it was 23.

14.10.2026 · 1.10.1

Corrections. Typing part of a town's name and pressing Enter now takes the town that is highlighted. Before, it could take the typed letters as a village under the Regional Plan, and the study then followed the Regional Plan's rules. The margins of Kolhapur's specified areas in Table 10-B are in feet and inches, which the table writes as 2.6 for 2 feet 6 inches; they are now shown as 2′ 6″, where they read as decimal feet. A continued sheet at the front of a study is no longer numbered as a new section.

Every study now states its edition: the version of Citiwise and of its rules data that worked it out, the consolidated text of the Directorate of Town Planning the rules are read from, and that Halfwrong LLP issues it. Its link opens it again worked out afresh from the same facts, and the study says so plainly. A link with no study behind it now says so, where it used to return to the home page.

The privacy page now says exactly what happens: the plot details are sent to work out the figures and are not stored, each opened study is kept under its short code so its link and QR code keep working, and both are held in Mumbai. It sets out your rights under the Digital Personal Data Protection Act, 2023, and how to raise a grievance.

Searching UDCPR for words that no regulation's title holds now looks through the text, the towns and the glossary, and says what deals with it. The Method page leads with the whole cases it replays, and shows the scrutiny values as counts sorted into groups, not as pass rates. The study now opens in about nine seconds the first time.

14.10.2026 · 1.10

The unit mix now follows how a project is actually planned. The flat types and their carpet areas are decided once, and the flats are then arranged in one of three ways. One building has a typical floor repeated on every floor. Wings are for a group housing project, where each wing has its own typical floor and its own number of floors, so an A wing of 2 BHKs can stand at twelve floors beside a B wing of 1 and 2 BHKs at seven. By ratio is for the stage before any floor is drawn: give the share of each type, such as 60% 2 BHK and 40% 3 BHK, and Citiwise works out how many flats the building that fits carries at those shares.

For wings, the study draws every wing's typical floor against the floor plate within the margins and gives each wing its building, height, flats, built-up and lifts (9.27.1). It names any wing that is a special building (1.3(93)(xiv)) and gives the side margin that sets its distance from a lower wing, since UDCPR 6.2.4 takes the distance between two buildings as the side or rear margin of the taller. It then sets the built-up the wings need against what the rules allow, with and without TDR, and works out parking for the whole project by Table 8-B.

14.10.2026 · 1.9

The unit mix is now asked the way a building is planned: how many flats of each type on a typical floor, and their carpet areas. Citiwise repeats that floor on every floor that carries flats, shows it as a strip against the floor plate the margins leave, and says whether it fits. The study draws the typical floor, counts the flats it makes, and notes where a carpet area sits just over the edge of a Table 8-B parking band, since a square metre less can change the cars required. A count for the whole building can still be given instead.

A new sheet, Permission, sets out how the building permission goes for the plot. Up to 150 m² and up to 300 m², UDCPR 2.6.3 and Appendix K give a low-risk and a moderate-risk procedure, for a residential building of the storeys and FSI they allow, on a plot from a sanctioned layout or regularised under Gunthewari. The sheet checks each condition against the plot, marks those to confirm, and lists the stages with their days: the demand note and the commencement certificate within ten days each, without scrutiny, and no plinth checking. Every other plot takes the regular permission, which the sheet sets out from the scrutiny fee to the occupancy certificate, with deemed permission at sixty days (2.6.2) and a commencement certificate valid for four years, renewed every year until the work commences (2.7.1). The days, areas and storeys are read from the UDCPR text.

Development charges are described at ready reckoner rates, as the premiums are.

14.10.2026 · 1.8

Every term Citiwise uses now has its meaning one tap away. A word with a dotted line under it, in the questions, the study on screen and the pages on towns, rules and UDCPR, opens a card: what it means in plain language, then UDCPR's own definition with its clause, and the way to the whole glossary. Fifty-eight terms are in it, from FSI, TDR and carpet area to the 7/12, the property card, the DP remark, the ready reckoner rate and the landowner's share.

Thirty of them quote UDCPR, read from the regulation text itself and tested word for word against it. Carpet area is defined in UDCPR 1.3(25) in the same words as the RERA Act. Where a word comes from another law or from practice, the card says so. The printed study and its PDF stay plain, and list their definitions as before.

In ChatGPT, Claude and other apps, search and fetch now answer what a term means, with its source.

14.10.2026 · 1.7.3

Citiwise now speaks the way the market does. Built-up areas are given in square feet beside square metres wherever a figure is weighed: on the first page, in the study's figures, the offer, the appraisal and the town pages. What each layer of FSI costs and keeps is in rupees a square foot, the unit the rates are given in.

The study calls the rate for premiums the ready reckoner rate, and defines it once against the Annual Statement of Rates that UDCPR names. A joint development is described by the landowner's share. A study for flats counts flats, by their type.

The questions ask for the area on the 7/12 or the property card, ask whether a plot lies in the gaothan or the old town, and describe what land handed over earns as in-situ FSI or TDR.

14.10.2026 · 1.7.2

Opening a study now takes about fifteen seconds the first time and half that once it has been seen. Every line shown while it is prepared is a figure the study holds, with the regulation it comes from, and the counts are the regulations cited and the figures worked out. Skip to the study, or Esc, goes straight to it. It ends on the answer: the built-up the rules allow, the building that fits and, with rates, what the land carries.

A section of the study that would end with a few lines on a sheet of their own is set closer, or its plans drawn at the next standard scale, so that it closes on a full sheet. The sample study is 19 sheets where it was 21. Document control is one paragraph, since every title block carries the same number, revision and date.

6.10.1 is listed by the words it begins with, "Height of building shall be allowed to the extent mentioned below", rather than by its second printed line.

14.10.2026 · 1.7.1

The site reads more plainly. Its sections are named the same way on every page: Towns, UDCPR, Method and Apps. The Marathi pages are in Marathi throughout, their navigation included.

Regulation headings that run over two or three printed lines now read whole, such as 6.1 for congested areas and gaothans. Quotation marks appear as printed, and a regulation without a heading of its own is listed by its opening words, marked where they are cut.

Town pages give areas in whole square metres, and the worked plot's parking is for as many flats as its building holds, 48 of 60 m² on 1,000 m² in Pune, where it was a fixed 12.

A study saved from the browser is named by its document number, as the PDF is, and its basis states the plot's origin in words.

14.10.2026 · 1.7

Every study with rates now opens with the offer: what the rules allow, what fits on the plot and what the land carries at those rates, side by side, with any offer or asking price set against them. Below it, each layer of FSI shows what it costs to unlock and what it keeps.

A study now says which of its facts were read from a paper and which were told. Mark the papers you have read for the plot, the 7/12, the measurement sheet, the zone certificate or DP remark and the sanctioned layout, and the study names what is still to be confirmed and from which paper.

Your rates are kept for each town on your device. The next plot in the same town starts from them, and the study says so. Your studies list what each plot carries.

14.10.2026 · 1.6

A joint development is settled across a table, with two people looking at one phone. When a study has its appraisal, its joint development can now be shown across the table: the phone lies between the landowner and the developer, each half the right way up for the one who reads it, and either of them can move the share of the flats. At the share offered it reads exactly as the study does, and at any other share it is the same arithmetic on the same rates, with the share the plot carries marked on the line. The screen stays awake while it is open. Held in a hand, both halves face the one holding it; laid flat on the table, the landowner's half turns to face across, and Turn round does the same by hand.

14.10.2026 · 1.5

Kolhapur district has pages of its own. Every corporation, council and nagar panchayat in the district now shows what the rules allow on plots of 1 to 10 gunthas along roads of 20 to 60 ft, in square feet, and answers the questions people there ask: how much can be built on a guntha, how many floors fit, what road widening earns and what changes in the gaothan. Each page is also in Marathi.

10.9.1 and Table 10-B: the 42 specified areas of Kolhapur, from Rajarampuri, Shahupuri and Laxmipuri to Tarabai Park and Sykes Extension, are on one page, each with its plot sizes, its margins in feet and metres, its basic FSI and the height its margins hold to.

The tool finds the towns of Kolhapur district by their Marathi names too.

Every regulation and table now names its source: the consolidated text the Directorate of Town Planning publishes, with a link to it, the page each one is printed on and the amendments noted beside it. Table 6-G is also set out as a table, with the notes that change its figures beside it.

The pages for the large cities and for every authority with rules of its own now list those rules, and the regulations that name the city, with the figures for plots of 1 to 10 gunthas.

The Checks page now says exactly what each test does, item by item. Values from scrutiny reports that match a figure the regulation gives were described as reproduced exactly; they show the rule gives that figure, not that a plot was reproduced, and the page now says so.

12.10.2026 · 1.4.1

The appraisal no longer stops when the TDR rate is not given. It prices the building without TDR, at the area basic and premium FSI allow with their ancillary area, and says so, so the residual land value and a landowner's share are always worked out from the rates that were given.

Plans show north. Give the direction the plot faces and the site plan and the envelope plan carry a north arrow. The origin of the plot, a sanctioned layout, a Gunthewari regularisation or a sub-division without permission, can now be given, and the open space and FSI follow it.

In ChatGPT, Claude and other apps, Citiwise stores nothing. The report link from an answer carries the plot in the link itself, and the study it opens holds the study alone.

11.10.2026 · 1.4

Basements: up to five levels, within the building's margins or flush with the ground out into the side and rear margins (9.11.1). Each level's area, the parking it holds, its height, top, ventilation and ramp (9.11.2, 9.12.2) appear in the figures and in the study, and the section shows the levels below ground.

Land can be given as people give it: in gunthas, acres, hectares or square feet, with roads in feet. Citiwise converts by definition and says what it read.

10.10.2026 · 1.3

UDCPR itself is now on Citiwise: every regulation and table of UDCPR 2020, as amended to 30.01.2025, on its own page at citiwise.in/udcpr, with references between regulations as links.

Assistants can search UDCPR and the town pages and read any regulation in full, in the form ChatGPT deep research and the OpenAI and Claude APIs expect, with a link to cite. Five ready prompts cover the common jobs: a plot's feasibility, reading land documents, checking a design, comparing uses and reading a regulation.

10.10.2026 · 1.2.1

Plots with inward corners: the building line is now the plot less each side's margin, worked exactly, so an L, a U or a many-sided plot gets the floor plate it really has. Before, such a plot could show no floor plate at all.

Drawings of plots with many or short sides now keep every figure legible, with a schedule of sides on the site plan.

09.10.2026 · 1.2

A plot can now have curved sides and rounded corners, and margins and road widening follow them.

  • 3.3.12, 3.3.13: the junction rounding note no longer appears where the corner is already drawn round.
09.10.2026 · 1.1

These readings changed:

  • The building Citiwise fits is now the fewest floors that use at least 98% of the potential. Taller options are still listed.
  • A building stays below 500 m² a floor, and so out of 1.3(93)(xiv), whenever that already uses the potential.
  • 7.8: IT buildings take their FSI in the industrial zone too.
  • 6.4 and Table 6-H: industrial buildings in the industrial zone take their margins and FSI from Table 6-H.
  • 13.6(B): a special building with a fire tower needs one lift plus the tower's lift, not a second lift and staircase.
  • Table 12-A, 12-G and 12-K: water and sanitation for hospitals by beds and hotels by rooms.
  • Table 7-A: the additional FSI for hotels, hospitals and IT is now in the premium total.

The report now draws the open space taken off the floor plate, says when a drawn plot differs from the area entered, and lists approvals and items to confirm on their own sheets.

08.10.2026 · 1.0

Public at citiwise.in: the site, a printable report, and a connector for Claude, ChatGPT and other apps.

These readings changed:

  • Table 6-D: side and rear margins follow the road-width row (note 1), with H/5 once the row's own height is passed (6.2.3(b)). Where some authorities read by plot size, a note says so.
  • Special buildings, 1.3(93)(xiv) and 3.3.9: 6 m on every side above 24 m, and for listed uses with a floor of 500 m² or more, with the 12 m road they need.
  • 6.1.2(b): congested assembly buildings and mangal karyalayas take non-congested margins; other congested buildings switch above 24 m, not at it.
  • 6.0 and Table 6-C: congested holdings over 0.4 ha take non-congested margins.
  • 6.10.1(i): the height limit leaves out a parking floor up to 6 m.
  • 6.10.1(ii): every use needs a 12 m road above 24 m.
  • Table 6-E: colleges and mangal karyalayas take 3 m on all sides.
  • 9.27.1: one lift above 15 m, two above 24 m.
  • Table 8-B: no parking for bungalows up to 300 m² and row houses up to 100 m²; carpet bands without gaps.
  • Table 9-G: houses above G+2 need 1.0 m stairs.
  • 7.8.2, 7.8.3: IT FSI on 12, 18 and 27 m roads applies everywhere, not only in MMR and Pune.

Added: the area statement in the form of Proforma I (Appendix A), premiums and payment options (2.2.14), TDR loading and DRC (11.2.6, 11.2.7), refuge areas (9.29.6), fire lift and fire tower (9.29.8, 13.6), indicative fire tanks (9.32), open space and amenity space (3.4, 3.5), inclusive housing (3.8), sanitation (12.6), stair risers and treads (9.29.3), NOCs.