UDCPR 2020 / Chapter 10, City specific regulations
10.2.6 Development around Defence Establishment
UDCPR 2020 as amended to 30.01.2025
(2) Following restrictions are imposed in and around the land in the vicinity of the said unit as per the plan enclosed with Notification No.TPS-1203/1254/C.R.193/05/UD-12, Dt.30/12/2006. Village : Kolshet / Kavesar / Waghbil (within the limit of Thane Corporation) Circle / Taluka : Thane, District : Thane, State: Maharashtra Height Restrictions :-
(a) The height restrictions to any of the future constructions on North, North-West, West and South-West sides will be as follows :-
Sr. Height Limiting zones from unit boundary Permissible Remarks.
No. (Zones indicated by colours) height in meters
A Red Nil Unit Area
B Brown Nil Buffer Zone (No Dev.
Zone)
C Orange 18 --
D Pink 27 --
E Navy Blue 32 --
F Yellow 46 --
G Violet 64 --
H Green 84 --
(1) Sr.No.(iii) & (iv) deleted vide Govt. Corrigendum No.CR.236/18, dt.09th December, 2020
(2) Substituted vide Corrigendum / Addendum No.CR.121/21, dt.02nd December, 2021
(2)
(b) The height restrictions to any of the future constructions on North East, East and South- East sides will be as follows :-
Sr. Height Limiting zones from unit boundary Permissible Remarks.
No. (Zones indicated by colours) height in meters
A Red Nil Unit Area
B Brown Nil Buffer Zone
(No Dev. Zone)
C Orange 15 --
D Pink 20 --
E Yellow 35 --
F Violet 40 --
G Sky Blue 45 --
Other Restrictions :- In addition to the above restrictions, following general restrictions are also enforced :-
a) No high tension power line up to 22 KV is to be setup within 1500 meters from unit boundary.
b) Open wires, overhead lines, including telephone cables are to be outside 500 meters from unit boundary. However, UG cables. (below 5 meters) are permissible.
c) No rail line with electric traction is permitted within two kilometers from the unit.
d) Area within one kilometer radius from unit boundary is to be clear of all metallic structures including bridges.
e) Ground water level is to remain constant. No efforts are to be made to change the electrical conductivity of the designated zone.
f) No industry / equipment, which generate any kind of RG noise, are permitted to operate within 1 km. Radius from unit boundary.
To see how 10.2.6 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
The text of the Unified Development Control and Promotion Regulations for Maharashtra State, as amended to 30.01.2025. The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.