14.10.6 Infrastructure Facilities
UDCPR 2020 as amended to 30.01.2025
The entire onsite infrastructure in the Integrated IT Township along with access road shall be
provided and maintained by the developer. However, it would be obligatory on the part of the developer to provide all basic infrastructures on at least 75% area under the Integrated IT Township within 3 years from the date of sanction of development proposals by the Authority;
failing which bank guarantee submitted by the project proponent/s shall be forfeited. The Project Proponent/s shall submit a bank guarantee of an amount equal to the 15% of estimated development cost required for development of the basic infrastructure such as roads, water supply, drainage & garbage disposal, installations for power supply, fire brigade station & fire engines. Such development cost be worked out as per respective phases taking into consideration the phased program for development of infrastructure with amenities under project as submitted. Certificate regarding estimated development cost shall be produced by the respective Architect of the project.
(1) Inserted / Substituted vide Notification u/s.37(1AA)(c) & 20(4) No.CR.97/2023/UD-13, dt.12th January, 2024
To see how 14.10.6 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
The text of the Unified Development Control and Promotion Regulations for Maharashtra State, as amended to 30.01.2025. The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.