UDCPR 2020 / Chapter 14, Special schemes

14.2.5 Regulations for BRT Corridor in Pimpri-Chinchwad Municipal Corporation

UDCPR 2020 as amended to 30.01.2025

FSI receiving or development potential of the plot shall be as below.

       Sr.                Road width in meters                        Basic         FSI on        Maximum           Maximum
       No.                                                             FSI         payment        permissible   building potential
                                                                                      of              TDR       on plot including
                                                                                   premium          loading         in-situ FSI
         1                               2                               3            4                5                  6
         1        Below 9 m.                                           1.00             --            --              1.00
         2        9 m. and above but below 12 m.                       1.00            0.50          0.75             2.25
         3        12 m. and above but below 15 m.                      1.00            0.50          1.00             2.50
         4        15 m. and above but below 24 m.                      1.00            0.50          1.25             2.75
         5        24 and above but below 30 m.                         1.00            0.50          1.50             3.00
         6        30 and above                                         1.00            0.50          1.75             3.25

(1) Inserted vide Notification u/s 37 (1AA)(c) No.CR 236/18 (Part 6), dt. 12 th October, 2022

To see how 14.2.5 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.

UDCPR 2020, 14.2.5, as amended to 30.01.2025. https://citiwise.in/udcpr/14-2-5

Source

These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. 14.2.5 is printed on pages 275 to 276 of that text. Read the official text (PDF).

The amendments noted beside these words in the official text:

  • Inserted vide Notification u/s 37 (1AA)(c) No.CR 236/18 (Part 6), dt. 12 th October, 2022.

The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.