UDCPR 2020 / Chapter 14, Special schemes
14.2.5 Regulations for BRT Corridor in Pimpri-Chinchwad Municipal Corporation
UDCPR 2020 as amended to 30.01.2025
FSI receiving or development potential of the plot shall be as below.
Sr. Road width in meters Basic FSI on Maximum Maximum
No. FSI payment permissible building potential
of TDR on plot including
premium loading in-situ FSI
1 2 3 4 5 6
1 Below 9 m. 1.00 -- -- 1.00
2 9 m. and above but below 12 m. 1.00 0.50 0.75 2.25
3 12 m. and above but below 15 m. 1.00 0.50 1.00 2.50
4 15 m. and above but below 24 m. 1.00 0.50 1.25 2.75
5 24 and above but below 30 m. 1.00 0.50 1.50 3.00
6 30 and above 1.00 0.50 1.75 3.25
(1) Inserted vide Notification u/s 37 (1AA)(c) No.CR 236/18 (Part 6), dt. 12 th October, 2022
To see how 14.2.5 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
UDCPR 2020, 14.2.5, as amended to 30.01.2025. https://citiwise.in/udcpr/14-2-5
Source
These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. 14.2.5 is printed on pages 275 to 276 of that text. Read the official text (PDF).
The amendments noted beside these words in the official text:
- Inserted vide Notification u/s 37 (1AA)(c) No.CR 236/18 (Part 6), dt. 12 th October, 2022.
The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.