UDCPR 2020 / Chapter 3, General land development requirements
3.1.9 Restrictions in the vicinity of Airport
UDCPR 2020 as amended to 30.01.2025
For structure, installations or buildings including installations in the vicinity of aerodromes,
i) The height shall be restricted to permissible top elevation as mentioned on Colour Coded Zoning Maps (CCZM) prepared by the Airport Authority of India (AAI) published on its web site.
ii) For any additional height beyond that mentioned in i) above, prior NOC from AAI shall be submitted.
iii) For the areas depicted in red colour on CCZM, prior NOC from AAI shall be submitted.
Note -
a) The height permitted by CCZM is indicated Above Mean Sea Level i.e. AMSL.
b) Building height permitted i.e. Above Ground level (AGL) shall be calculated as CCZM height minus the site elevation of the plot. Height of building (AGL) = CCZM height - site elevation.
(1) Inserted vide Corrigendum / Addendum No.CR.121/21, dt.02nd December, 2021
(#) Clarificationissued vide Order No.CR.236/18 (Part –2), dt.23rd December, 2021
c) In absence of aforesaid map, no objection certificate of Airport Authority of India shall be required.
Explanation
i) Irrespective of their distance from the aerodrome, even beyond the 20 km. limit from the aerodrome reference point, no building, radio masts or similar installation exceeding 150 m. in height shall be erected without prior permission of the Civil Aviation Authorities.
ii) The location of a slaughter house / abattoir / butcher house or other areas for activities like depositing of garbage which may encourage the collection of high flying birds, like eagles and hawks, shall not be permitted within 10 km. from the aerodrome reference point.
To see how 3.1.9 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
UDCPR 2020, 3.1.9, as amended to 30.01.2025. https://citiwise.in/udcpr/3-1-9
Source
These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. 3.1.9 is printed on pages 41 to 42 of that text. Read the official text (PDF).
The amendments noted beside these words in the official text:
- Inserted vide Corrigendum / Addendum No.CR.121/21, dt. 02nd December, 2021.
The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.