UDCPR 2020 / Chapter 4, Land use classification and permissible uses
4.6 Future urbanizable zone
UDCPR 2020 as amended to 30.01.2025
In this zone all uses permissible in Residential Zone shall be permitted subject to fulfilment of following requirements.
i) For extending offsite infrastructure like road, water supply, sewage line, electricity, to the land, the expenses shall be borne by the owner and shall be deposited with the Authority as per the expenses communicated by it. However the owner shall have liberty to construct such infrastructure at his own cost, as per the drawing, design and specification approved by the Authority.
ii) If the land is located on Development Plan road of width more than 18.0 m., then construction of road of width 18.0 m. to his land, shall be the liability of the owner, else 12.0
m. wide road with asphalting shall be necessary.
To see how 4.6 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
UDCPR 2020, 4.6, as amended to 30.01.2025. https://citiwise.in/udcpr/4-6
Source
These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. 4.6 is printed on page 65 of that text. Read the official text (PDF).
The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.