UDCPR 2020 / Chapter 9, Requirements of part of building
9.28.2 Type of Exits
UDCPR 2020 as amended to 30.01.2025
An exit may be a doorway, a corridor, a passage or a way to an internal staircase or external staircase, ramp or to a varandah and / or terraces which have eaves to the street or to roof of a building. An exit may also include a horizontal exit leading to an adjoining building at the same level. Lifts and escalators shall not be considered as exits.
(#) Clarification issued vide Order No.CR.236/18 (Part 2), dt.23rd December, 2021
To see how 9.28.2 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
UDCPR 2020, 9.28.2, as amended to 30.01.2025. https://citiwise.in/udcpr/9-28-2
Source
These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. 9.28.2 is printed on pages 162 to 163 of that text. Read the official text (PDF).
The amendments noted beside these words in the official text:
- Clarification issued vide Order No.CR.236/18 (Part 2), dt. 23rd December, 2021.
The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.