UDCPR 2020 / Chapter 9, Requirements of part of building

9.28.2 Type of Exits

UDCPR 2020 as amended to 30.01.2025

An exit may be a doorway, a corridor, a passage or a way to an internal staircase or external staircase, ramp or to a varandah and / or terraces which have eaves to the street or to roof of a building. An exit may also include a horizontal exit leading to an adjoining building at the same level. Lifts and escalators shall not be considered as exits.

(#) Clarification issued vide Order No.CR.236/18 (Part 2), dt.23rd December, 2021

To see how 9.28.2 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.

The text of the Unified Development Control and Promotion Regulations for Maharashtra State, as amended to 30.01.2025. The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.