UDCPR 2020 / Chapter 9, Requirements of part of building

9.29.5 Corridors and passageways

UDCPR 2020 as amended to 30.01.2025

i) The minimum width of a corridor shall not be less than 75 cm. in the case of 2 storeys row housing residential buildings and 100 cm. in the case of other buildings and actual width shall be calculated based on the provision of Regulations No.9.28.3 to 9.28.8 (both inclusive)

ii) Where there is more than one staircase serving a building, there shall be at least one smoke- stop door in the space between the staircases.

iii) Exit corridors & passageways shall be of width not less than the aggregate required width of exit doorways leading from them in the direction of travel of the exterior / stairways.

iv) Where stairways discharge through corridors & passage ways the height of the corridors & passage ways shall not be less than 2.4 m.

v) All means of exit including staircases, lifts, lobbies & corridors shall be adequately ventilated.

(1) Inserted vide Notification u/s.37(1AA)(c) No.CR.236/18 (Part 6), dt.12th October, 2022

To see how 9.29.5 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.

UDCPR 2020, 9.29.5, as amended to 30.01.2025. https://citiwise.in/udcpr/9-29-5

Source

These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. 9.29.5 is printed on pages 167 to 168 of that text. Read the official text (PDF).

The amendments noted beside these words in the official text:

  • Inserted vide Notification u/s.37(1AA)(c) No.CR.236/18 (Part 6), dt. 12th October, 2022.

The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.