UDCPR 2020 / Chapter 9, Requirements of part of building
9.4.3 Other requirements of bath room and water closet
UDCPR 2020 as amended to 30.01.2025
Every bathroom or water-closet shall –
i) be so situated that it derives ventilation from ventilation shaft or external air;
ii) have a window or ventilator, opening to a shaft or open space, of area not less than 0.3 sq.m. with side not less than 0.3 m.;
iii) all the sewerage outlets shall be connected to the sewerage system. Where no such systems exist, a septic tank shall be provided within the plot conforming to the requirements of Regulation No.9.25.
To see how 9.4.3 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
UDCPR 2020, 9.4.3, as amended to 30.01.2025. https://citiwise.in/udcpr/9-4-3
Source
These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. 9.4.3 is printed on page 154 of that text. Read the official text (PDF).
The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.