UDCPR 2020 / Chapter 14, Special schemes
Table 14-H Planning Considerations (14.1.1.7)
UDCPR 2020 as amended to 30.01.2025
Table No.14-H
Sr. Particulars (1)
(Deleted) Minimum Built-up Area
No. required
i For Master Layout area of 40 ha. (1)
(Deleted) 80000 sq.m.
ii For Master Layout area more than To be increased proportionately with increase
40 ha. in Master Layout area and be proposed at one
or more locations, as per requirements.
(1)
Modified vide Notification u/s.37(1AA)(c) & 20(4) bearing No.CR.105/2022/(Part-2)/UD-13, dt.05th September, 2024
Note :-
(1)
1) No dedicated plot shall be insisted for economic activities. Such activity may be allowed
in the ITP area at sutable location/s and in composit building also. Economic activities
component users may be clubbed together with activities mentioned in c and d above,
subject to condition that, total built-up area should not be less than the summation of
minimum required for all such users and other use restrictions as mentioned in UDCPR.
2) However, for the additional FSI availed by payming premium, additional built-up area for
economic activities shall be provided @ 10%.
3) If any area as mentioned in 14.1.1.2 is excluded by the project proponent for calculation
of FSI, then the mandatory town level amenities and 2% area to be handedover to local
authority shall be calculated on the net area by deducting such excluded area from the
gross plot.
g) Public Utilities :- For Master Layout area up to & inclusive of 200 ha.
To see how Table 14-H and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.