UDCPR 2020 / Chapter 9, Requirements of part of building
Table 9-C Ventilation Shaft
UDCPR 2020 as amended to 30.01.2025
Table No.9-C - Ventilation Shaft
Sr. Height of Cross-section of Ventilation Minimum one dimension of
No. Buildings in m. shaft in Sq.m. the shaft in m.
(1) (2) (3) (4)
1 Upto10 1.2 0.9
2 Upto12 2.4 1.2
3 Upto 18 4.0 1.5
4 Upto 24 5.4 1.8
5 Upto30 8.0 2.4
6 Above 30 9.0 3.0
Note :-
a) For buildings above 30.0 m., mechanical ventilation system shall be installed besides the
provisions of minimum ventilation shaft.
b) For fully air-conditioned residential / other buildings, the ventilation shaft need not be
insisted upon, provided the air-conditioning system works in an uninterrupted manner, also
provided; there is an alternative source of power supply.
To see how Table 9-C and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.
UDCPR 2020, Table 9-C, as amended to 30.01.2025. https://citiwise.in/udcpr/table-9-c
Source
These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. Table 9-C is printed on pages 160 to 161 of that text. Read the official text (PDF).
The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.