UDCPR 2020 / Chapter 11, Acquisition and development of reserved sites in development plans

11.2.7 Utilisation of Transferable Development Rights (TDR) and Road Width Relation

UDCPR 2020 as amended to 30.01.2025

i) The total maximum permissible built-up area and utilisation of Transferable Development Rights (TDR) on receiving plot shall be, as per Regulation No.6.1, 6.2 and 6.3.

ii) The quantum of maximum permissible TDR loading mentioned in Table 6-G of Regulation No.6.3 shall include minimum 30% and maximum 50% slum TDR / URT / Amenity TDR (wherever applicable). If such TDR is not available, the other TDR may be used. Moreover, this shall not be applicable for TDR loading mentioned in Regulation No.6.1.1. Table 6-A.

iii) The utilisation of Transferable Development Rights (TDR) shall be permissible by considering

(1) the provision mentioned in Note (xiv) below Table No.6-G of Regulation No.6.3.

To see how 11.2.7 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.

The text of the Unified Development Control and Promotion Regulations for Maharashtra State, as amended to 30.01.2025. The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.