UDCPR 2020 / Chapter 2, Development permission and commencement certificate

2.1.7 Repairs to Building

UDCPR 2020 as amended to 30.01.2025

The permission shall not be required for the following types of repairs to existing authorised building, which do not amount to additions or alternations. Only intimation to the Authority by the owner alongwith the certificate of licensed personnel shall be given.

i) Changing of doors and windows in the same position.

ii) Strengthening of existing walls, existing roof in the same position.

iii) Any other items similar to above.

To see how 2.1.7 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.

UDCPR 2020, 2.1.7, as amended to 30.01.2025. https://citiwise.in/udcpr/2-1-7