UDCPR 2020 / Chapter 10, City specific regulations

Table 10-D Reconstruction / Redevelopment of Building in CIDCO / NMMC Areas (10.10.2)

UDCPR 2020 as amended to 30.01.2025

Table No - 10 D
                Area of the Plot under           Additional Entitlement (As % of the Carpet
                   Redevelopment                       Area of the Existing Tenement)
                    Upto 4000 sq.m.                                   Nil
               Above 4000 sq.m. to 2 hect                            10%
                Above 2 hect. to 5 hect.                             15%
                Above 5 hect. to 10 hect.                            20%
       Explanation : The plot under redevelopment means the total area of the land on which
       redevelopment of dangerous / dilapidated building(s) is to be undertaken.
       Provided that the maximum entitlement of rehabilitation area shall in no case exceed the
       maximum limit of carpet area prescribed for MIG category by the Govt., as applicable
       on the date of approval of the redevelopment project.

         Provided further that the entitlement of rehabilitation area, as admissible under this
         regulation, shall be exclusive of the area of balcony.
     ii) Under redevelopment of any dangerous / dilapidated building(s) in a Housing
          Scheme of CIDCO, the entitlement of rehabilitation area of any existing authorized
          commercial unit / amenity unit in the Residential Housing Scheme shall be equal
          to the carpet area of the existing unit plus 20% thereof.
B) Incentive FSI : Incentive FSI admissible against the FSI required for rehabilitation, as
   calculated above, shall be based on the ratio (hereinafter referred to as Basic Ratio) of
   Land Rate (LR) in Rs. / sq.m. of the plot under redevelopment as per the Annual
   Schedule of Rates (ASR) and Rate of Construction (RC)* in Rs. / sq.m. applicable to the
   area as per the ASR and shall be as given in the Table below :-

To see how Table 10-D and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.

UDCPR 2020, Table 10-D, as amended to 30.01.2025. https://citiwise.in/udcpr/table-10-d

Source

These words are UDCPR 2020 as the Directorate of Town Planning, Government of Maharashtra, publishes it in its consolidated text, as amended to 30.01.2025 with earlier provisions and corrections. Table 10-D is printed on pages 194 to 195 of that text. Read the official text (PDF).

The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.