UDCPR 2020 / Chapter 14, Special schemes

14.2.1.2 Maximum Permissible FSI

UDCPR 2020 as amended to 30.01.2025

The maximum permissible total FSI in TOD zone shall be 4.00 including the base permissible FSI, subject to condition that, the additional FSI over and above the base permissible FSI shall be allowed within the overall limit of maximum permissible FSI, as given in the Table below -

              Sr. No.                    Road width in m.                            Maximum Permissible FSI
                  1                             2                                              3
                   1          9.0 m. and up to 12.0 m.                                        2.50
                   2          12.0 m. and up to 15.0 m.                                       3.00
                   3          15.0 m. and up to 24.0 m.                                       3.50
                   4          24.0 m. and above                                               4.00

Note : The Regulations as pertaining to Ancillary FSI as listed in the principle DCPR shall be applicable on the above mentioned FSI. The Built-up Area Calculation shall be in accordance with Regulation 6.6 of UDCPR.

Under this regulation

To see how 14.2.1.2 and the rest of UDCPR apply to a particular plot, with the clause behind every figure, open Citiwise.

The text of the Unified Development Control and Promotion Regulations for Maharashtra State, as amended to 30.01.2025. The notification of the Urban Development Department, Government of Maharashtra, is the authoritative text.